Title and statement of responsibility area
Title proper
General material designation
Parallel title
Other title information
Title statements of responsibility
Title notes
Level of description
Repository
Reference code
Edition area
Edition statement
Edition statement of responsibility
Class of material specific details area
Statement of scale (cartographic)
Statement of projection (cartographic)
Statement of coordinates (cartographic)
Statement of scale (architectural)
Issuing jurisdiction and denomination (philatelic)
Dates of creation area
Date(s)
-
1866-1874 (Creation)
- Creator
- Grand Trunk Railway
Physical description area
Physical description
1 item
Publisher's series area
Title proper of publisher's series
Parallel titles of publisher's series
Other title information of publisher's series
Statement of responsibility relating to publisher's series
Numbering within publisher's series
Note on publisher's series
Archival description area
Name of creator
Administrative history
The Grand Trunk Railway (GTR) was built to provide a main trunk line throughout the entire length of the Province of Canada. Under the sponsorship of Sir Francis Hincks, the Grand Trunk Railway was formally incorporated in 1852 to build a railway line from Toronto to Montreal. The Grand Trunk Railway of Canada East was also incorporated to build a line from Quebec City to Trois Pistoles, Quebec. The GTR also purchased the newly completed St. Lawrence and Atlantic Railroad in 1853. Much of the financing for the Railway was to come from investors in England, and as a result, much of the construction of the new lines was done by English construction firms. The "Trunk-Line" from Montreal to Toronto opened in 1856. The railway expanded quickly, existing small railway companies were purchased, and new lines were added, some of which were destined for the United States. By 1867, the GTR was the largest railway system in the world with 2 055 km of track. By the 1880's the company had over 700 locomotives, 578 cars, 60 post-office cars, 131 baggage cars, 18 000 freight cars and 49 snow plows. The high cost of construction, absentee management (Head Office in England), and failure to generate anticipated levels of traffic left the GTR debt ridden and unable to upgrade its equipment. In October 1919, the federal government took over the GTR after a disasterous attempt to create a transcontinental railway with the creation of the Grand Trunk Pacific Railway. The GTR and the GTPR were placed under the management of the Canadian National Railways on January 30, 1923. ( Taken from: "The Canadian Encyclopedia." Edmonton: Hurtig Publishers Ltd., 1985.)
Custodial history
Scope and content
This item is a foreman's wage and material book from the Engineer Department of the Grand Trunk Railway, showing the name and occupation of workers, rate and amount of pay and material used for each four week period, 1866 to March 7, 1874. Each page bears the notation "paid at Belleville".
Notes area
Physical condition
Some of the pages a stuck together and most of the pages have been torn
Immediate source of acquisition
This item was donated from an unknown source
Arrangement
Language of material
Script of material
Location of originals
Availability of other formats
Restrictions on access
None
Terms governing use, reproduction, and publication
Finding aids
Associated materials
Associated material located at Library and Archives Canada (RG 30)