Title and statement of responsibility area
Title proper
General material designation
Parallel title
Other title information
Title statements of responsibility
Title notes
Level of description
Repository
Reference code
Edition area
Edition statement
Edition statement of responsibility
Class of material specific details area
Statement of scale (cartographic)
Statement of projection (cartographic)
Statement of coordinates (cartographic)
Statement of scale (architectural)
Issuing jurisdiction and denomination (philatelic)
Dates of creation area
Date(s)
-
1964-2017 (Creation)
Physical description area
Physical description
26 folders of textual records and architectural plans
72 photographic slides
Publisher's series area
Title proper of publisher's series
Parallel titles of publisher's series
Other title information of publisher's series
Statement of responsibility relating to publisher's series
Numbering within publisher's series
Note on publisher's series
Archival description area
Name of creator
Custodial history
Scope and content
This series consists of documents written on the growth and development of the Athletics Centre from 1964-2014, including reports, newspaper clippings, and correspondence. The Athletics Department has gone through many periods of transformation. From shared facilities in downtown Peterborough, to a temporary Air Hall, to having a permanent home on the Nassau campus. There was a great need for a designated facility at the Nassau Campus. Budgets initially allowed for a temporary ‘air hall’ to be set up to relieve the need for renting shared facilities in downtown Peterborough. Eventually, a new building was developed on the west bank of the Nassau campus and became the permanent location for the Athletics Centre. This is reflected in the architectural briefs, drawings, research and publications of the development of the Athletics Centre building and services offered.